20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator

20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator
price on request
Contact the seller
Call me back
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator - Machineryline
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator | Image 1 - Machineryline
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator | Image 2 - Machineryline
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator | Image 3 - Machineryline
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator | Image 4 - Machineryline
20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator | Image 5 - Machineryline
Interested in the ad?
Request additional photos
1/5
Price:
on request
Notify me when price changes
Type: final drive
Part number: 20Y-27-00500 708-8F-00250
Spare part type: original spare part
Year of manufacture: 2018
Location: China
Placed on: yesterday
Machineryline ID: FG52858
Condition
Condition: remanufactured
Warranty:: 6 months

More details — 20Y-27-00500 final drive for Komatsu PC200-8EO PC200-8 midi excavator

PC200‑8EO PC200‑8 Final Drive for Komatsu Excavator spare parts 20Y‑27‑00500 708‑8F‑00250 OEM

Product Overview

Walk onto almost any earthmoving site in the world and a Komatsu PC200‑8 is somewhere on it — the 20‑ton class benchmark, built in such numbers that its parts have become a language of their own. The EO badge marks the fuel‑savvy variant, but both versions share the same undercarriage: an axial piston travel motor and planetary reduction box, references 20Y‑27‑00500 and 708‑8F‑00250, tucked into each track frame. That pair takes high‑pressure flow from the main pump and trades speed for the low‑speed torque needed to crawl the machine across muddy cut slopes. On a PC200‑8 that has logged real hours, the drive gives itself away gradually — a lazy track on the pull back up the ramp, a warmth through the track frame that was not there last month, a faint whine that rises with revs. Leave it and the piston scores metal into the oil, and that swarf then does the motor's next set of wear for it. This OEM‑grade unit arrives as one complete, bench‑run assembly, matching both the standard PC200‑8 and the EO variant, so the old drive lifts out and the new one drops straight in.

Core Advantages

1. The world's most common 20‑ton drive, built to match
Because the PC200‑8 sold in such volumes, the drive's clearances, porting and mounting are well documented. This OEM‑grade unit follows those drawings rather than approximating them.

2. Straight tracking on long haul roads
A lapped piston block and valve plate hold pressure without internal slip, so both tracks pull the same on a grade. The operator stops fighting a machine that wanders to one side.

3. Gears that keep their manners over years
Ground, hardened planetary teeth mesh with controlled backlash — no early rattle, no harshening whine. The reducer stays civilised as hours pile up on pipelines and road jobs.

4. Sealed for mud season and dust season alike
Whether the site is wet clay or quarry dust, fresh shaft and housing seals keep the bad stuff out of the lube. That is the line between a drive that reaches its first rebuild and one that does not.

5. Drop‑in fit, same afternoon
Flange, studs and ports match the original, so the service crew swaps the whole drive rather than assembling it on the floor. A parked PC200‑8 is a parked earner.

Manufacturing & Quality Control

Parts are machined to Komatsu print, heat‑treated at wear points, and built in a clean shop. Each finished unit runs on a hydraulic stand while torque, leakage and noise are logged; anything off the numbers comes apart for rework. Before crating, internals are fogged with preservation oil, ports are plugged, and the unit sits on dunnage for sea and road freight.

Frequently Asked Questions

Q1: Does this fit both the PC200‑8 and the EO version?
A: The references cover both builds. Send the machine serial number and any tag from your old drive and we confirm before dispatch.

Q2: Do I reuse the sprocket?
A: Usually yes — the sprocket transfers over from the old drive. If yours is hooked, ask about a replacement at the same time.

Q3: What break‑in does the operator need?
A: Take the first shift easy on loaded grades. Light, cycling use seats the new gears and seals before the machine goes back to full digging.

Q4: What's excluded from cover?
A: Materials and build defects are covered. Dirty oil, debris in the motor, a stalled track forced into movement, overload or a botched install are not. Keep arrival photos for any claim.
Request additional information
Important
Description provided by the seller. Please verify all details directly with the seller.
Purchase tips
Safety tips
Seller Verification

If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.

Price Check

Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.

Do not buy products which price is too different from the average price for similar equipment.

Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.

Doubtful prepayment

The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.

Varieties of this fraud may include:
  • Transfer of prepayment to the card
  • Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
  • Transfer to the “Trustee” account
  • Such a request should be alarming, most likely you are communicating with a fraudster.
  • Transfer to a company account with a similar name
  • Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
  • Substitution of own details in the invoice of a real company
  • Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Found a fraud?
Let us know
Safety tips
Similar ads
Selling machinery or vehicles?
You can do it with us!
Price on request
Final drive
207-27-00413 207-27-00412 207-27-00411 207-27-00410
China
Contact the seller